-
Notifications
You must be signed in to change notification settings - Fork 158
Pull requests: openshift/ovn-kubernetes
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[release-4.16] OCPBUGS-57396: Fix predicate for cluster subnet route to gateway router
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2645
opened Jun 25, 2025 by
ricky-rav
Loading…
OCPBUGS-57883: Updating ovn-kubernetes-microshift-container image to be consistent with ART for 4.20
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2644
opened Jun 20, 2025 by
openshift-bot
Loading…
OCPBUGS-57882: Updating ose-ovn-kubernetes-container image to be consistent with ART for 4.20
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2643
opened Jun 20, 2025 by
openshift-bot
Loading…
[release-4.19] DownStream Merge Sync from 4.20 [06-18-2025]
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
qe-approved
Signifies that QE has signed off on this PR
#2642
opened Jun 18, 2025 by
jluhrsen
Loading…
5 tasks
OCPBUGS-57578: Updating ose-ovn-kubernetes-base-container image to be consistent with ART for 4.20
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2640
opened Jun 18, 2025 by
openshift-bot
Loading…
OCPBUGS-57170: DownStream Merge [06-18-2025]
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
qe-approved
Signifies that QE has signed off on this PR
#2639
opened Jun 18, 2025 by
pliurh
Loading…
5 tasks
[release-4.16] OCPBUGS-57396: Fix predicate for cluster subnet route to gateway router #2630
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
qe-approved
Signifies that QE has signed off on this PR
#2637
opened Jun 17, 2025 by
ricky-rav
Loading…
[WIP] 4.19 test: Add allow-stateless ACLs for advertised L2 UDNs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2632
opened Jun 16, 2025 by
trozet
Loading…
5 tasks
[WIP] Merge 6 10 25 json replacement
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#2629
opened Jun 11, 2025 by
trozet
Loading…
QE/DNM: EgressIP: fix startup syncer to parse IP instead of CIDR
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
qe-approved
Signifies that QE has signed off on this PR
#2628
opened Jun 11, 2025 by
martinkennelly
Loading…
QE/DNM; Gate ovn-controller start until ovnkube controller syncs
#2626
opened Jun 10, 2025 by
martinkennelly
Loading…
5 tasks
[DNM] Add IPsec tunnel state metric for IKE Child SA establishment
#2625
opened Jun 5, 2025 by
pperiyasamy
Loading…
[release-4.16] OCPBUGS-55282: Fix hybrid overlay node subnets collision with cluster subnets
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
qe-approved
Signifies that QE has signed off on this PR
#2621
opened Jun 5, 2025 by
pliurh
Loading…
5 tasks
[release-4.19] OCPBUGS-55997: Guard against PMTUD route caching for Kubernetes Node IPs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2617
opened Jun 4, 2025 by
trozet
Loading…
OCPBUGS-57011: Updating ovn-kubernetes-microshift-container image to be consistent with ART for 4.18
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2614
opened Jun 3, 2025 by
openshift-bot
Loading…
OCPBUGS-57008: Updating ose-ovn-kubernetes-container image to be consistent with ART for 4.18
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
bugzilla/valid-bug
Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2613
opened Jun 3, 2025 by
openshift-bot
Loading…
[WIP] Reverts all changes up to ecf7e81f11254e99d024f4c96119c5ed3038b959
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2602
opened May 30, 2025 by
trozet
Loading…
[release-4.18] OCPBUGS-48710, OCPBUGS-55263, OCPBUGS-46401: DownStream Merge Sync from 4.19 [05-28-2025]
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
cherry-pick-approved
Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
jira/severity-critical
Referenced Jira bug's severity is critical for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
qe-approved
Signifies that QE has signed off on this PR
#2593
opened May 28, 2025 by
jluhrsen
Loading…
[WIP] Configures ephemeral port range for OVN SNAT'ing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#2584
opened May 22, 2025 by
trozet
Loading…
5 tasks
OCPBUGS-55962: Inter advertised UDN isolation configurable
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2569
opened May 12, 2025 by
pperiyasamy
Loading…
[DNM] Ovs cpu part2 saga revert set6
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2563
opened May 10, 2025 by
tssurya
Loading…
[DNM] Ovs cpu part2 saga revert set4
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2561
opened May 10, 2025 by
tssurya
Loading…
[DNM] Ovs cpu part2 saga revert set3
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2560
opened May 10, 2025 by
tssurya
Loading…
Previous Next
ProTip!
Adding no:label will show everything without a label.