This project aims to test the control system.
Integration tests:
Latency tests:
- nturt_control_latency_test, result: roughly 60 ms
- nturt_micro_ros_latency_test, result: up to 2 ms, but consumes 99% of cpu time
- nturt_rpi_can_latency_test, result: roughly 3 ms for two rpi