List view
- No due date•0/9 issues closed
New milestone with a target date 6 weeks from v1.1.4.0
Overdue by 7 year(s)•Due by March 13, 2018•13/18 issues closed(EDIT: This milestone needs to be renamed, I think. It is incorrectly labelled because we had a v1.1.1 release just after v1.1.0 that didn't include these things (it was necessary to increase release number to fix version number errors in CKAN config files in v1.1.0's release).) (Original text: Milestone items moved out of v1.1.0 for the sake of getting the release out the door. This is a pending list, and items can be moved back to v1.1.0 if needed.)
No due date•0/15 issues closed- No due date•7/9 issues closed
- No due date•1/6 issues closed
These are issues that - we _think_ are fixed but which need to be verified and have a reference provided - are a discussion that we think we came to agreement on but never formally said so or closed the conversation. Anyone with spare time feel free to test them out and close if fixed. (The Z prefix is to keep the milestone at the bottom of the list.
No due date•2/13 issues closedWe have a need for some serious infrastructure work. right now every release is a super manual and error prone process.
No due date•6/8 issues closedThese are the new features that are ready to pick up and work on.
No due date•7/17 issues closed