-
Notifications
You must be signed in to change notification settings - Fork 12
Open
5 / 75 of 7 issues completedLabels
Description
Shortlist of devices needed (ongoing):
- Attenuator (See Create devices for attenuation on I19 #1007 )
- Pinhole and collimator stage (See Add pinhole and collimator stages control for I19-2 #1508 )
- Diffractometer (Add Diffractometer device of i19-2 #1073 )
- Cryostream
- Backlight (See Add a backlight device on I19-2 #1522 )
- Beamstop (Create a beamstop device for i19 #1067) - NOTE. sometimes used to mount the sample on on eh2)
- Floating stages (used for beamstop on eh2)
- Shutter (this should reuse the already existing hutch shutter with a small addition: check that movement is allowed - #1020)
- Zebra (device exists already, just needs instantiation in beamline file - 1021)
- Eiger detector (See Create an eiger detector device for I19-2 #1523 )
- Tristan detector
- Panda (See Instantiate panda device on i19-2 #1521 )
Use existing ones where possible.
NOTE. To be split in multiple issues/PRs for each new device and linked here.